Shoreline work in the Point Park and its Seven Oaks area in Fort Frances is nearly finished.
About 7-thousand tonnes of rock has been put in place to protect the shore from eroding from the high waters of Rainy Lake and the upper Rainy River.
Operations and Facilities Manager Doug Brown says they still have to fix the road and sidewalks impacted by the heavy equipment.
As a result, the road to the Seven Oaks area will be closed a little while longer.